HEADER } p { text-align: justify; }
vlcsnap-2018-12-21-15h52m35s631_800x450.jpg

The environmental survey is repeated every year by AUS-ROV on behalf of MCC to ensure that this particular outfall pipeline is operating to the design specification. At the surface, the corals that have been growing on the pipeline since its installation, appear to be flourishing in these rich with life waters off Madang Province in Papua New Guinea. The Teledyne SeaBotix vLBV ROV fitted with Sony HD Zoom Camera returns superior high definition video which enables us to identify the smallest of defects or anomalies when performing surveys. AUS-ROV have been performing work in Papua New Guinea since 2011 and have developed a strong understanding of the ways in which work must be carried out. We look forward to working again in PNG in the near future.

Footer