JULY 2015 INSPECTION OF HYDRO POWER GENERATION TURBINE AT WIVENHOE POWER STATION

Aus-Rov Wivenhoe Power Station.jpg

Wivenhoe Power Station is the only pumped storage hydroelectric plant in QLD. It consists of two 250 megawatt units that are the largest hydro machines in Australia and weigh 1,500 tonnes each. AUS-ROV performed ROV General Visual Inspection (GVI) of the intake screens and turbine / pump shaft and bearing at the beginning of July. The operations team deployed the vLBV300 High Definition ROV from approximately 13 metres above the water level with the specially designed quick deployment and recovery system from SeaBotix. The ROV provided high resolution video of the turbine components, intake screens and concrete foundations the power station stands on.

Previous
Previous

JULY 2015 RECOVERY OF FISH MONITORING DEVICES FOR SYDNEY INSTITUTE OF MARINE SCIENCE

Next
Next

JUNE 2015 AUS-ROV PERFORM ROV TRAINING AND DEEP SEA TAILINGS PIPELINE SURVEY IN PNG